Detailed inspection of footbridge attached to F. Mitterrand bridge.
The DREAL Nouvelle-Aquitaine is procuring an initial detailed inspection of a footbridge attached to the F. Mitterrand bridge before its commissioning. The inspection must cover structural integrity and safety compliance. Bidders need relevant civil engineering inspection qualifications and experience with similar bridge structures. The contract is for a one-time inspection service with a short duration.
Open the official notice for the full requirements, documents and submission details.