145 kV cable system for Aarau substation.
The procurement covers the design, supply, installation, and commissioning of a 145 kV high-voltage cable system for the Aarau substation located at Erlinsbacherstrasse 65, 5000 Aarau, Switzerland. The buyer is likely the local utility or grid operator responsible for the substation. Key requirements include compliance with Swiss electrical standards and possibly certification for high-voltage work. The project involves a single lot for the cable system. Duration is implied to be a fixed-term construction project.