Engineering design for Olympus stream regulation in Saronikos.
The Municipality of Saronikos is procuring engineering design services for the delineation and regulation of the Olympus stream. The study aims to define the stream's boundaries and propose measures for its regulation, likely to address flood protection or environmental management. The contract is expected to involve technical studies, environmental assessments, and design plans. Bidders must have relevant experience in hydraulic engineering or watercourse management. The duration is not specified but typical for such studies is 12-24 months.