48-month framework for electric pumps for water and wastewater systems, 2 lots.
The contracting authority is establishing a 48-month framework agreement for the supply of electric pumps for water supply, sewerage, and purification systems. The procurement is divided into 2 lots and falls under special sectors. The buyer is an Italian entity operating in the water and wastewater sector. No specific qualifications or set-asides are mentioned, but bidders should be capable of supplying industrial-grade electric pumps for public utility infrastructure. The scale is implied by the 4-year duration and multiple lots.