Third-party inspections for steel, concrete, waterproofing on M6 Lune Gorge bridges.
Kier Transportation requires a subcontractor to perform third-party independent inspections for steelwork fabrication, precast concrete fabrication, and on-site waterproofing over 7 bridges (14 structures) on the M6 Lune Gorge Junction 37 to 38. Some inspection work may be required in Europe.